Project Type: Infrastructure
Duration: 2024 –
Project Size: 4 km
Developer: Rana Municipality
Geoteknia AS is engaged in connection with the rehabilitation of water and wastewater infrastructure at several locations in Rana Municipality during the period 2024–2028. The assignment is carried out as a subconsultant to EM Prosjekt AS.
Geoteknia is responsible for the planning, execution, and reporting of ground investigations, as well as the geotechnical design of the project. The work includes assessments of trench stability, area stability, and foundation design for the water and wastewater infrastructure, with a focus on safe and buildable solutions for the development works.