Project type: Bridge
Duration: 2024 – 2026
Project size: 23 m span
Developer: Agder fylkeskommune
Client: Degree of Freedom
In connection with the planned replacement of Løgane Bridge, Geoteknia AS is contributing to the project as a subconsultant to Degree of Freedom on behalf of Agder County Municipality.
The existing bridge, dating from 1952, has significant damage to its substructure, including rot in timber elements and impact damage caused by vessels.
The new bridge is a single-span composite bridge approximately 23 metres long. The foundations are designed with end-bearing steel core piles socketed into bedrock. The project forms part of the County Municipality’s efforts to improve the resilience of its bridge infrastructure following the damage caused by the extreme weather event Hans.